Journal of Geotechnical Geology

Journal of Geotechnical Geology

Application of AHP-MCDM Method to Estimate the Delay-time of Tabriz-Bonab Highway Project

Yazarlar: Seyed Mehdi Mostafavi, Sara Soranj

Cilt 15 , Sayı 2 , 2019 , Sayfalar 319-326

Konular:-

Anahtar Kelimeler:Engineering project management,Analytic hierarchy process,Multiplecriteria decision analysis,Delay-time assessment,Highway Project

Özet: Road construction projects are considered as the largest infrastructure projects in Countries, which always face the most problems in construction. The longitudinal extent of the projects has caused them to cross different geological conditions and be under different climatic conditions which involvement of various factors in operation of road construction has caused time delays. In this regard, the present study has tried to consider the relationship between factors affecting the project construction and time delay of Tabriz-Bonab road project. For this purpose, the multi-criteria hierarchical analysis (AHP-MCDM) method has been used to prioritize and measure the effective factors in the project. Based on the evaluations, 6 main factors including human, environmental, managerial, technical, infrastructure and technical errors were involved in the project, each of them can be divided into several sub-factors which managerial as well as infrastructure factors have the greatest impact on the project delay and environmental factors have the least impact on the project.


ATIFLAR
Atıf Yapan Eserler
Henüz Atıf Yapılmamıştır

KAYNAK GÖSTER
BibTex
KOPYALA
@article{2019, title={Application of AHP-MCDM Method to Estimate the Delay-time of Tabriz-Bonab Highway Project}, volume={15}, number={319–326}, publisher={Journal of Geotechnical Geology}, author={Seyed Mehdi Mostafavi, Sara Soranj}, year={2019} }
APA
KOPYALA
Seyed Mehdi Mostafavi, Sara Soranj. (2019). Application of AHP-MCDM Method to Estimate the Delay-time of Tabriz-Bonab Highway Project (Vol. 15). Vol. 15. Journal of Geotechnical Geology.
MLA
KOPYALA
Seyed Mehdi Mostafavi, Sara Soranj. Application of AHP-MCDM Method to Estimate the Delay-Time of Tabriz-Bonab Highway Project. no. 319–326, Journal of Geotechnical Geology, 2019.