Engineering Sciences

Engineering Sciences

YAPI MALİYETİNİN FONKSİYONEL ELEMAN YÖNTEMİ İLE TAHMİNİ

Yazarlar: Latif Onur UĞUR

Cilt 4 , Sayı 4 , 2009 , Sayfalar 449 - 458

Konular:-

DOI:10.12739/nwsaes.v4i4.5000067116

Anahtar Kelimeler:Construction Costs,Functional Entity Method (FEM),Regression Analysis,Housing,Building

Özet: Main objective of this study is forecasting of construction costs with Functional Entity Method (FEM). For this aim, construction costs of similar reinforced concrete buildings calculated with Unit Price Method (UPM). This costs used as data for Regression Analysis model. Building elevations, unit numbers in a flat, normal flat areas, heights of flats, total flats, outer surface's empty areas, outer surfaces total areas and average areas of the units in normal flats were assumed as mean criterias of the cost of each apartment. Results of FEM, compared with the results of UPM and performence of FEM evaluated. Result of FEM gave near the real costs and can be us efor forecasting of similar construction's costs. Value of R2 is near to 1 and this means the model is adequate to use. Using hybrid methods for solving this kind of problems, will be useful than using only one method. Studying with similar methods for calculating different kind of buildings costs, will create positive developments.


ATIFLAR
Atıf Yapan Eserler
Henüz Atıf Yapılmamıştır

KAYNAK GÖSTER
BibTex
KOPYALA
@article{2009, title={YAPI MALİYETİNİN FONKSİYONEL ELEMAN YÖNTEMİ İLE TAHMİNİ}, volume={4}, number={449–458}, publisher={Engineering Sciences}, author={Latif Onur UĞUR}, year={2009} }
APA
KOPYALA
Latif Onur UĞUR. (2009). YAPI MALİYETİNİN FONKSİYONEL ELEMAN YÖNTEMİ İLE TAHMİNİ (Vol. 4). Vol. 4. Engineering Sciences.
MLA
KOPYALA
Latif Onur UĞUR. YAPI MALİYETİNİN FONKSİYONEL ELEMAN YÖNTEMİ İLE TAHMİNİ. no. 449–458, Engineering Sciences, 2009.